| METHOD
STATEMENT FOR SURFACE PREPARATION
1. Painted external wall surface
Description of work
- Jet washing to remove dust, dirt and loose
paintworks
- For fungus-infected areas, anti-fungus solution
shall be used to eradicate the fungus and wash
down with clear water
- Patch up visible hairline cracks using appropriate
filler for cracks more than 2mm, "v-cut"
along the crack and backfill affected area with
appropriate sealant
Redecoration with SKK Architectural Coating
 |
| 1.Setup
access |
2. Surface preparation |
3. Apply spray coating |
|
2. Painted metal surface
Description of work
- General cleaning and wire-brushing to all
rusty surfaces
- Spot prime on rusty area using anti-rust primer
where necessary after wire-brushing
Redecoration with SKK Super Durable Painting
3. Painted timber surface
Description of work
Light sanding and cleaning of the timber surface
to remove surface contaminants Redecoration with
SKK Super Durable Painting
School project
4. Ceramic Mosaic Tile Surface
I Refresh with SKK Tile Refresh System
SKK Tile Refresh System is a new application system
that removes the persistent oil and exhaust gas
stains adhering to surfaces, with the etching
effect of a special cleaner.
After cleaning the surfaces, the system prevents
deterioration of tile joints and surfaces. The
bright reflective property of ceramic/ mosaic
surfaces and joints can be restored to the original
beauty through the application of an environmental- friendly
extra low stain weak solvent type polyurethane
clear coat.
II Recondition with SK Tile Filler
Resurfacing with SK Tile Filler allows one to
renew instead of removing the degraded substrates.
SK Tile Filler System omits unnecessary hacking
and removing of debris from site and provides
a cost effective solution to the ever-prevalent
degradation problem. Subsequently, skim-coated
surface can be received with architectural coatings
(such as Graniterior EX) or protective paints
(such as Compo Silicon W55).
5. Floor Surface
General Floor Surface Treatment
- Weak concrete substrate due to contamination
or non-durability should be removed by using
grinning or hacking machine.
- Make sure surface is free from dust, dirt
and contamination
- Fill up pinholes and hollows with SK Epo Filler.
- Apply SK Epo Filler by steel trowel to create
even surface
Surface Requirements
The newly power-floated/ steel trowel smooth
finish with fine gripping and without concrete
enrichment shall be allowed 28 days curing to
achieve the designed strength. Moisture level
of substrate has to be 15% and below (measured
by Protimeter) before commencement of the floor
coating system.
Applying SK Epo Filler
Recondition floor before apply SKK's floor coating
6. Natural Stone and Bare Concrete
Surface
Description of work
- Jet washing to remove dust, dirt and foreign
particles
- For fungus-infected areas, anti-fungus solution
shall be used to eradicate the fungus and wash
down with clear water
Protection of Natural Stones and Bare Concrete
From Harsh Environment Condition
Job References
7. Curtain Wall Surface
Although most curtain walls receive regular maintenance
by washing, they could still suffer from discolouration,
chalking and corrosion because of pollution and
contamination from exhaust gas and acid rain.
A complete solution to the "Curtain Wall
Refresh System" is being implemented to overcome
the stained curtain walls.
Outline of Treatment
| 1. Cleaning |
Remove dust, oil and silicon dirt by using
SK Cleaner Super |
| 2. Washing (1) |
Wash off cleaner well with water |
| 3. Sanding |
Sand previous coating evenly. If heavily
defected, use #350 paper. |
| 4. Washing (2) |
Wash off dirt, chalking etc. well |
| 5. Drying |
Dry the surface properly |
| 6. Primer |
Apply anti-rust primer |
| 7. Undercoat |
Apply SK #100 primer |
| 8. Finish coat |
Apply Ceratight Series (F, Si, or U) |
|